AI Drawing Check Proposal
GWork · AI Drawing Review

AI drawing check · standard solutionAI 图纸审查 · 标准方案

Let AI review the drawing set first. Your engineers decide on the findings.

图纸先交给 AI 审一遍,工程师只做判断

Give GWork a drawing set and the standard it must follow. GWork runs the review on a specialist AI review engine and brings back marked-up sheets, an issue list and a proposed fix for each issue.

把图纸和要遵守的规范交给 GWork。GWork 调用专业的 AI 审图引擎完成审查,带回标注好的图纸、问题清单和每个问题的修改建议。

You provide您提供

Drawings and your standards图纸与规范 PDF or DWG, plus codes, specifications or checklistsPDF 或 DWG,以及规范、技术规格或检查清单

We run我们执行

One request in GWork在 GWork 里一句话发起 GWork drives the review engine from start to finishGWork 全程驱动审图引擎

You receive您得到

Marked-up PDF and issue list标注 PDF 与问题清单 Each issue with severity, sheet evidence and a fix每个问题带严重程度、图纸证据和修改建议

LAYOUT PLANSIDE VIEW3.5 m R.C. ACCESS ROADTANK 1TANK 2TANK 3PUMP SUMP445 L TANKTANK DEPTH15Tank depths disagree池体深度不一致civil and mechanical sheets differ土建图与机电图数值不同12Access road too narrow进厂道路过窄3.5 m, minimum is 4 m3.5 m,最小要求 4 m11Water tank too small水箱容量不足445 L, minimum is 675 L445 L,最小要求 675 LSTP 300 PE · LAYOUTSHEET 3/7 · REV 2
Illustration of a marked-up sheet. Each numbered callout points to the exact area and states the issue.标注图纸示意。每个编号标注指向具体位置,并说明问题。

The problems today

现在的痛点

Review is slow and manual审图靠人工,速度慢

Engineers read every sheet line by line and compare it with the standard by hand.工程师逐张逐行看图,再手工对照规范。

Conflicts between sheets get missed图纸之间的冲突容易漏

A level, dimension or rating on one sheet disagrees with another, and nobody sees both at once.同一个标高、尺寸或额定值在两张图上不一致,但没有人同时看到两处。

Compliance depends on a few senior people合规检查依赖少数资深人员

Local standards run to hundreds of clauses. Results vary with who reviews and how much time they have.当地规范有上百条条款,结果取决于谁来审、有多少时间。

Issues surface late问题发现得太晚

What is missed on paper becomes an RFI, a resubmission or rework on site.图纸阶段漏掉的问题,到后面变成 RFI、重新报审或现场返工。

Findings are hard to hand over审查结果难以交接

Comments sit in emails and hand markups, without a clear list of what to fix and who owns it.意见散落在邮件和手写标注里,没有清晰的整改清单和责任人。

How we solve it

我们的解决方式

Two parts, each doing what it is best at. Your team works in GWork and never has to learn another tool.

两个部分各做自己最擅长的事。您的团队只在 GWork 里工作,不需要再学一个新工具。

Today现在With GWork使用 GWorkDrawing set图纸Read sheet by sheet人工逐张看图compare with the code by hand手工对照规范Scattered comments意见分散emails and hand markups邮件和手写标注Issues found on site问题到现场才发现RFIs and reworkRFI 与返工Drawings + standard图纸 + 规范GWorkGWorkone request一句话发起AI review engineAI 审图引擎cross-checks every sheet交叉核对每张图Marked-up PDF + issue list标注 PDF + 问题清单engineer decides工程师做判断
Today, problems travel all the way to site. With GWork, they are caught on the drawings and handed over as one list.现在,问题一路带到现场才暴露。使用 GWork 后,问题在图纸阶段就被发现,并整理成一份清单交付。

Your team您的团队

Engineers and reviewers工程师与审图人员Hand over drawings, decide on each finding提交图纸,对每个问题做判断
Project managers项目经理Receive the summary, follow issues to closure接收摘要,跟进问题直到关闭
↕plain-language requests and results自然语言发起,结果直接返回

Your AI workspaceAI 工作台

GWorkDesktop AI agent. Takes the request, runs every step, checks progress on a schedule, saves the result files.桌面 AI 智能体。接收需求、执行每一步、定时查询进度、保存结果文件。
↕secure connection (MCP with sign-in, or API)安全连接(需登录授权的 MCP,或 API)

Review engine审查引擎

AI Review EngineAI 审图引擎Reads the sheets, cross-checks them against each other and against your standards, and produces evidence-linked issues and marked-up drawings.读取图纸,做图纸之间以及图纸与规范之间的交叉核对,输出带证据的问题和标注图纸。
Where you work工作入口

GWork

  • One request starts the whole review
  • Confirms the cost before anything is charged
  • Waits, checks progress and tells you when it is done
  • Summarises the findings in your language
  • 一句话启动整个审查
  • 扣费前先确认费用
  • 自动等待、查询进度,完成后通知
  • 用您的语言总结审查结果
The specialist专业引擎

AI Review EngineAI 审图引擎

  • Built for construction drawings, not general chat
  • Every finding points to the exact sheet and clause
  • Exports marked-up PDF, report, CSV and Bluebeam markups
  • 专为工程图纸打造,不是通用聊天模型
  • 每个问题都指向具体图纸位置和规范条款
  • 可导出标注 PDF、报告、CSV 和 Bluebeam 标注

How a review runs

一次审查怎么走

You您GWorkGWorkReview engine审图引擎Hand over drawings提交图纸01Set up, confirm cost建任务、确认费用02Review the set审图20 min to 1 day20 分钟到 1 天03Bring back results取回结果04Decide, follow up判断并跟进05drawings + standard图纸 + 规范files + brief文件 + 审查要求issues + marked-up PDF问题 + 标注 PDFsummary + files摘要 + 文件checks progress on a schedule定时查询进度
You only touch the first and last step. GWork carries the work to the review engine and back.您只参与第一步和最后一步,中间由 GWork 把工作送到审图引擎再带回来。
  1. 01

    Hand over the drawings

    提交图纸

    Tell GWork which drawing set to review, which standard applies and what to focus on.

    告诉 GWork 要审哪套图纸、适用哪份规范、重点看什么。

    You您
  2. 02

    GWork sets up the review

    GWork 建立审查任务

    It creates the project in the review engine, attaches the drawings and the standard, writes the review brief and shows you the cost.

    在审图引擎中创建项目,挂上图纸和规范,写好审查要求,并向您展示费用。

    GWork
  3. 03

    The engine reviews the set

    引擎审图

    It reads every sheet, compares sheets with each other and with the standard, and records each issue with its evidence. This takes from 20 minutes to a day, depending on size.

    逐张读图,做图纸之间和图纸与规范之间的比对,并记录每个问题及其证据。根据图集大小,需要 20 分钟到一天。

    Review engine审图引擎
  4. 04

    GWork brings back the result

    GWork 取回结果

    It lists the issues by severity, explains the important ones and prepares the marked-up drawings and report.

    按严重程度列出问题,解释重点问题,并准备好标注图纸和报告。

    GWork
  5. 05

    Your engineers decide and follow up

    工程师判断并跟进

    They accept or dismiss each finding, assign the fixes and re-check the revised drawings.

    工程师对每个问题确认或驳回,指派整改,并对修改后的图纸复审。

    You您

What the solution can do

方案功能

Drawing review图纸审查

Sheet-to-sheet consistency图纸一致性检查

Finds dimensions, levels, ratings, labels and schedules that disagree between sheets and disciplines.找出不同图纸、不同专业之间不一致的尺寸、标高、额定值、标注和明细表。

Compliance with your standards对照您的规范做合规检查

Upload the local code or your own checklist. Each finding cites the clause or table it relies on.上传当地规范或贵司检查清单,每个问题都引用所依据的条款或表格。

Drawings against specifications图纸与技术规格核对

Catches materials, sizes and equipment that differ between the drawings and the project documents.发现图纸与项目文件之间不一致的材料、规格和设备。

Missing and unclear information缺失与不清晰信息

Flags wrong references, incomplete schedules and details a contractor could not build from.标出错误的索引、不完整的明细表,以及施工方无法照图施工的细节。

Revision comparison版本对比

Lays two versions of a sheet over each other in two colours to show what changed.把同一张图的两个版本以两种颜色叠加,直接看出改了什么。

Many drawing types and languages多种图纸类型与语言

Architectural, structural, MEP, civil and electrical sets, in PDF or DWG, including scanned sheets and mixed-language sets.建筑、结构、机电、土建和电气图纸,PDF 或 DWG,支持扫描件和多语言混排。

Results you can use可直接使用的结果

Marked-up drawings标注图纸

Numbered callouts on each sheet with an arrow to the exact area, ready to send to the design team.每张图上带编号标注和指向箭头,可直接发给设计方。

Issue list with proposed fixes带修改建议的问题清单

Severity, discipline, impact and recommended correction, as a PDF report or a spreadsheet.严重程度、专业、影响和建议的修改,可出 PDF 报告或表格。

Questions in plain language自然语言追问

Ask about the drawings or a finding and get an answer with sheet references.就图纸或某个问题提问,回答会附上图纸出处。

Assignment and tracking指派与跟踪

Assign issues to owners, add comments, and mark them reviewed, resolved or dismissed.把问题指派给负责人、添加评论,并标记为已复核、已解决或已驳回。

Run from GWork在 GWork 里完成

One request starts everything一句话发起

Describe the drawing set, the standard and the focus. GWork carries out every step for you.说明图纸、规范和审查重点,GWork 替您完成每一步。

Cost confirmed first先确认费用

GWork shows the price of the review and starts only when it is covered or approved.GWork 先展示本次审查的费用,在额度覆盖或您确认后才启动。

Automatic follow-up自动跟进

GWork checks progress on a schedule and reports back when the review is finished.GWork 定时查询进度,审查完成后主动汇报。

Showcase: sewage treatment plant, Sabah

案例:沙巴污水处理厂

A 300 PE packaged sewage treatment plant for a commercial development in Sandakan, checked against the Sabah standard for sewage treatment plants (STS-5). The review ran in the background and finished the same day.

山打根某商业开发项目的 300 PE 一体化污水处理厂,对照沙巴污水处理厂规范(STS-5)进行审查。审查在后台运行,当天完成。

What went in输入

  • 6 drawing sheets: layout, front and side views, steel platform, pump sump, electrical schematics and panels
  • The STS-5 standard, 100 pages
  • Brief: STS-5 compliance and consistency between sheets
  • 6 张图纸:总平面、正视与侧视图、钢平台、泵坑、电气原理图和配电柜
  • STS-5 规范,100 页
  • 审查要求:STS-5 合规性与图纸之间的一致性

What GWork didGWork 做了什么

  • Connected to the review engine with one sign-in
  • Created the project and attached the drawings
  • Wrote the review brief and confirmed the cost
  • Started the review and monitored it
  • Retrieved every issue, exported the report and wrote a Word summary
  • 一次登录授权即连接审图引擎
  • 创建项目并挂上图纸
  • 写好审查要求并确认费用
  • 启动审查并持续跟进
  • 取回全部问题,导出报告并生成 Word 摘要
GWork · STS-5 drawing reviewSTS-5 图纸审查
Review this drawing set against STS-5 and give me the marked-up PDF.按 STS-5 审查这套图纸,把标注好的 PDF 给我。
  • Project created, drawings and standard attached
  • Review brief written: STS-5 compliance and sheet consistency
  • Cost checked: covered, nothing to pay
  • Review started
  • Progress checked every 30 minutes until done
  • 36 issues retrieved, report exported, summary written
  • 已创建项目,挂上图纸和规范
  • 已写好审查要求:STS-5 合规与图纸一致性
  • 已确认费用:额度覆盖,无需付款
  • 已启动审查
  • 每 30 分钟查询一次进度,直到完成
  • 已取回 36 个问题,导出报告并写好摘要

Task plan任务计划

Deliverables成果文件

  • Issue report.pdf问题报告.pdf
  • Issue summary.docx问题摘要.docx
The GWork screen for this review, redrawn: the request and GWork's steps on the left, progress and result files on the right.按本次审查重绘的 GWork 界面:左侧是需求和 GWork 的执行步骤,右侧是进度和成果文件。

What came out输出

36
issues found, 106 pages read个问题,共读取 106 页
12 high · 2 medium · 22 low高 12 · 中 2 · 低 22

Delivered as交付形式

  • PDF issue report with the sheet evidence
  • Word summary: one table of all 36 issues, then the detail by severity
  • Each issue with description, impact, recommendation and sheet numbers
  • Marked-up drawings available as a further export
  • 带图纸证据的 PDF 问题报告
  • Word 摘要:36 个问题的总表,再按严重程度列出详情
  • 每个问题包含描述、影响、修改建议和图号
  • 标注图纸可另行导出

Good to know

需要了解的事项

  1. Engineers stay in charge. The AI does the first pass and organises the evidence. It does not certify compliance or replace professional judgment.
  2. Bring your local standards. The review is as specific as the codes and checklists you provide.
  3. Results are not instant. A review runs in the background for 20 minutes to a day. GWork notifies you when it is ready.
  4. Your drawings stay yours. Drawings are processed in the review engine provider's cloud. The provider states that it does not train on customer data. We agree the data terms with you before any project starts.
  1. 工程师始终是决策者。AI 完成第一轮审查并整理证据,不构成合规认证,也不替代专业判断。
  2. 请提供当地规范。提供的规范和检查清单越具体,审查结果越有针对性。
  3. 结果不是即时的。审查在后台运行 20 分钟到一天,完成后 GWork 会通知您。
  4. 图纸归您所有。图纸在审图引擎提供方的云端处理,提供方声明不会用客户数据训练模型。项目开始前我们会与您确认数据条款。

How to start

如何开始

  1. Pick one drawing set. Send us a real set and the standards it must meet.
  2. Run a pilot review. We run it in GWork and walk your engineers through the findings.
  3. Set your standard brief. Together we fix the review focus, the standards library and the delivery format.
  4. Roll out. Your team runs reviews themselves in GWork.
  1. 选一套图纸。提供一套真实图纸和需要满足的规范。
  2. 做一次试点审查。我们在 GWork 里执行,并带着贵司工程师过一遍结果。
  3. 确定标准审查要求。一起固化审查重点、规范库和交付格式。
  4. 推广使用。贵司团队自己在 GWork 里发起审查。